TourBot 5: IT’S DONE

I know its now past official senior project time and spring break now… but I think I have a legitimate excuse for not finishing TourBot.

I was competing with the Westtown Robotics Team at the Springside Chesnut Hill Regional Event with this robot. We took 2nd.

So back to TourBot…

Last time I posted, TourBot looked like this. I could have called it done and wired it but it would have been ugly. So I took it apart again and broke out the krylon…

WP_20130313_003

After painting everything I put it back together,

WP_20130313_011

admired my work, and started to wire it.

WP_20130313_009

I soldered leads on the motors and connected them to the Speed Controllers and wired them to the battery. I also added a charging port so the robot can be plugged into the wall like a cell phone or laptop to charge the battery.

WP_20130319_008 cropped
yeah.. my wiring job isn’t exactly pretty… I know…

Besides programing TourBot Tourmentor is done.

Enjoy some beauty shots…

WP_20130313_019

WP_20130319_006

I still need the tablet to complete it.

TourBot 4: Yes I still exist

March 7th 2012

“It should be driveable by tomorrow”

-Alex Horne

Yeah… about that….

I spent the weekend working on helping to get the Metal Moose ready for its competition this coming weekend. So I did not have a lot of time to work on TourBot…

WP_20130307_004

I began by mounting the motors to the drive pods which was as simple as drilling four holes…

When I designed the drivetrain and decided to stick it inside a 2.5″x2.5″ tube I did not take into account the fact that I would have to fit a chain in there…

WP_20130308_006
test wrapping the chain to find the length I needed

It worked fine when I wrapped the chain around the sprockets outside the tube, but that was because I could see what I was doing and reach everything. Continue reading “TourBot 4: Yes I still exist”

TourBot 3: More Stuff Gets Built…

If this is you’re first time reading about TourBot please read post #1 and post #2 otherwise this post won’t make a whole lot of sense

With the arm completed, today’s mission was to make the drivebase. (the frame and wheels)

drivebase

Now, anyone who follows my previous posts will probably remember in my first post there was a picture of two TourBot designs that were almost the same, but how the wheels were mounted was different. That was becasue deep down inside I harbored the hope that we would have enough money to pay to have the pieces water jetted. But the budget wasn’t big enough for that so….

WP_20130306_006
notice how I’m standing on scrap aluminum becasue I’m too short…

I went to work with the angle grinder….

WP_20130306_008

and cut out four rectangles in two 18″ long pieces of 2 1/2″x1 1/2″ box aluminum

WP_20130306_016

drilled and tapped the mounting holes…

cut the other frame pieces, assembled them, added wheels

WP_20130306_039
and (once again) through the magic of me forgetting to take pictures we ended up with this…

Things left to do

  • mount the motors and chain
  • make/mount the top and bottom plates
  • mount the arm on the drivebase
  • add electronics
  • wire it
  • paint it
  • make Ben program it

It should be driveable by tomorrow

TourBot 2: Stuff gets Built…

tb

Last time I posted about TourBot it looked like this.  Which is cool, except for one slight problem. It only exists on my computer. Today’s goal was to change that…

So I did the only sensible thing and started assembling the motors/gearboxes. (a part I won’t need until about 1/2 the way through the build.)

WP_20130305_001

The three gearboxes and motors that will be used in TourBot before assembly.

WP_20130305_005

The first step after getting everything out of the packaging was putting the pinion on the motor’s shaft. Which is easier said than done because the pinion’s hole is about .002″ smaller than the shaft’s diameter. This means that once its on the shaft it isn’t coming off or slipping. However it makes it pretty much impossible to put the pinion on the shaft without an arbor press. I do not own an arbor press.

WP_20130305_019

I had to improvise with my drill press. Because drill press and arbor press are close enough, right? I mean they both have the word “press” in their name.

WP_20130305_020
tweezers made this so much easier

After getting the pinions on the motors I then greased the gearboxes. This was another one of those easier said than done things. To grease a gearbox you need to take it apart and remove all the gears and squirt grease in between each layer of gears.  Because the gearboxes are high reduction (64:1) planetary gearboxes, there are a lot of gears in them. Fifteen to be exact and in order to reassemble the gearboxes they all had to be perfectly aligned to the ring gear for it to fit.

WP_20130305_022

After repeating this process two more times, I had three gearboxes done and moved on to building the arm.

el_arm_o

I started by taking all the measurements from my CAD drawing, and then cutting out the pieces from my tube steel collection.

I began by making the moving parts of the arm. This involved welding a 25″ long square piece of tube to a round piece to make a T shape.

WP_20130305_029

I then made another one and cut the steel to mount them…

WP_20130305_035

and then test fitted everything…

WP_20130305_037

and welded more…

forgot to take pictures…

WP_20130305_043
you have no idea how hard it was to balance it so it stood up for the picture…

and ended with the arm done, sans paint.

TourBot

My name is Alex Horne and for my Senior Project I, along with with my classmate Ben, am building a tour guide robot for Westtown School’s Admissions office. We are both heavily involved in Westtown’s Robotics Team, which Ben is a co-captain of. I’ve been building combat robots (made famous by the former TV show BattleBots) for the past three years. So between the two of us I’d say we’ve got at least a little experience with robots. Continue reading “TourBot”